North Fork Bath Co.

Pricing

How much does a bathroom remodel cost in Austin?

Most of our bathroom remodels in the Austin area cost between $15,000 and $45,000. Shower remodels and tub to shower conversions sit toward the lower end. Full primary bathroom remodels with a new layout reach $45,000 or more. Your price depends on the size of the room, whether plumbing moves, and the tile, glass and fixtures you choose.

Projects start at
$15,000
Large primary baths
$45,000+
Typical timeline
12 to 16 weeks

Example prices by project type

These examples show a typical price and timeline for each kind of job. Yours will be priced to your own bathroom.

ProjectWhat it includesTypical priceTimeline
Tub to shower conversionRemoved builder tub and surround. Green vertical tile walls and penny tile floor. Wood-lined niche, rain head and frameless glass.$17,50012 weeks
Hall bathroom refreshMarble-look hexagon tile floor. White subway tile tub surround. Navy vanity with quartz top, new fixtures and lighting.$18,00013 weeks
Curbless walk-in showerZero-threshold shower with one continuous tile floor. Travertine slab walls with two built-in niches. Frameless glass panel and brass wall controls.$24,50014 weeks
Primary bathroom, full gutFull demo and new layout. Custom tile shower with glass and tiled tub surround. Marble vanity top by Newbold Stone.$45,00016 weeks
See each example project

What drives the cost of a bathroom remodel

Size of the room and how much tile

Tile is priced by the square foot to buy and to set. A floor-to-ceiling shower in a large primary bath has several times the tile of a hall bath with a tiled tub surround.

Moving plumbing or changing the layout

Keeping the drain, valve and toilet where they are is the simplest way to keep cost down. Moving them means new plumbing runs, often a permit and inspections, and more time.

Curbless entries

A shower with no curb needs the floor recessed so tile can run straight in. On a slab that means cutting and lowering the concrete; on a raised floor it means lowering the framing. A low curb costs less.

Tile choice and pattern

Large-format porcelain, natural stone, zellige and small mosaics take more time to set than standard tile, and patterns like herringbone add cuts. The material price varies widely too.

Glass

A single fixed glass panel costs less than a hinged frameless door. Custom glass is measured after the tile is set, so it is ordered late in the job.

Vanity and countertop

A stock vanity costs less than a custom one. We build custom vanities and countertops with our local partner Newbold Stone, sized to your room.

Fixtures

Valves, shower heads, handheld showers, faucets and lighting range from basic to high end. Your quote lists the ones we priced so you can trade up or down.

What is behind the walls

Old leaks, rotted framing or a failed shower pan only show up once the walls are open. If we find damage, we show you and give you a written change before doing any extra work.

How to keep the cost down

  • Keep the drain, valve and toilet where they are
  • Choose a low curb instead of a fully curbless entry
  • Pick a standard tile size and a straight layout
  • Use a fixed glass panel instead of a hinged door
  • Refresh a hall bath without moving walls

What your written quote shows

After the walkthrough, Dalton sends a written, itemized quote. It lists the demo, plumbing, waterproofing, tile, glass, vanity, fixtures and any permits as separate lines, so you can see where the money goes and what changes if you trade something up or down. It also gives you a firm start date and the timeline for each phase.

What to expect during your remodel

How payment works

Three payments, each tied to a point in the job.

Deposit

30% of the quote

Due when you sign the quote. It holds your start date and orders materials.

Progress payment

30% of the quote

Due when waterproofing is complete, before tile goes up.

Final payment

The remaining 40%

Due after the final walkthrough, once the punch list is done.

No surprises. Every payment matches a line on your itemized quote.

Bathroom remodel cost questions

How much does a bathroom remodel cost in Austin?

Our projects start at $15,000 and can go past $45,000 for a large primary bathroom with a new layout. Shower remodels and tub to shower conversions usually land toward the lower end. You get a written, itemized quote after the walkthrough.

Why do your projects start at $15,000?

Every shower we build gets a fully bonded waterproofing system before any tile goes up, our own crew sets the tile, and the owner is on site for the whole job. That is what keeps water out of your walls for the long run, and it does not fit a budget makeover.

Are permits included in the price?

Yes. If your project needs a permit, we pull it, schedule the inspections and list it on your quote.

What if you find damage once the walls are open?

We show you what we found and give you a written change before doing any extra work. Nothing is added to your bill without your sign-off.

When do I pay?

30% when you sign the quote, 30% when waterproofing is complete and before tile goes up, and the remaining 40% after the final walkthrough once the punch list is done.

How long does a remodel take?

Most projects take 12 to 16 weeks from start to finish, including lead time for tile, fixtures and glass and cure time between steps. Your quote lists a firm start date and each phase.

Want a real number for your bathroom? Start with a walkthrough.

CallBook