North Fork Bath Co.

Full Remodels

Full bathroom remodels

We take the room down to the studs and rebuild it around how you actually use it. A new layout if you want one, plumbing where it needs to go, and custom tile from the floor up.

Projects start at
$15,000
Typical timeline
14 to 16 weeks
Primary bathroom with white marble tile, freestanding tub and large frameless glass walk-in shower

What is included

Demo and haul-off

We take out everything down to the studs and subfloor and haul it away.

Plumbing and electrical

Moved or replaced by licensed trades, with permits pulled for you.

Waterproofing and tile

A fully bonded waterproof system, then custom tile set by our own crew.

Vanity, fixtures and paint

Vanity, top, mirror, lighting, fixtures and paint, installed and finished.

A good fit if

  • The layout does not work for how you use the room
  • Tile, fixtures and vanity are all dated at once
  • You have soft spots, leaks or water damage
  • You want to move the shower, tub or toilet

Questions we hear

Do I need a permit?

If we move plumbing or electrical, yes. We pull the permit, schedule the inspections and list it on your quote.

Can I use the bathroom during the remodel?

No. Plan on the room being out of use for the full timeline. We seal it off with dust barriers so the rest of the house stays livable.

What to expect during your remodel

A recent project

Finished primary bathroom with skylights, glass tile shower, mosaic tub surround and marble vanity, Leander

Leander · Full Bathroom Remodel

Primary bathroom, full gut

A primary bathroom taken down to the studs and rebuilt under two skylights. The new layout has a glass-enclosed tile shower, a mosaic-tiled tub surround and a marble vanity top made by Newbold Stone.

What we did

  • Full demo and new layout
  • Custom tile shower with glass and tiled tub surround
  • Marble vanity top by Newbold Stone
Quoted price
$45,000
Timeline
16 weeks
See all of our work

Thinking about full bathroom remodels? Start with a walkthrough.

CallBook