North Fork Bath Co.

Shower and Tub Updates

Shower remodels

We tear out the old shower and build a new one with fully bonded waterproofing, custom tile, frameless glass and new valves and fixtures. The rest of the bathroom stays as it is.

Projects start at
$15,000
Typical timeline
12 to 14 weeks
Walk-in shower with blue zellige tile, brass fixtures, frameless glass door and marble curb

What is included

Tear-out to the studs

Old tile, pan and backer come out so we can see what is behind them.

Bonded waterproofing

Walls and floor are sealed as one system before any tile goes up.

Custom tile and niches

Your tile, laid out ahead of time, with niches and benches built in.

Glass and fixtures

New valve, shower head and frameless glass measured after the tile is set.

A good fit if

  • Grout keeps cracking or turning dark
  • The shower floor or walls feel soft
  • You are done with a fiberglass insert
  • You want a bench, niche or rain head

Questions we hear

Why does a shower take 12 weeks or more?

Most of it is lead time and cure time. Tile and fixtures are ordered for your project, waterproofing and mortar cure between steps, and custom glass is measured only after tile is set. Your quote lists each phase.

Can you keep my current layout?

Yes. Keeping the drain and valve where they are is the simplest way to keep cost down.

What to expect during your remodel